Ball valve components should be ordered by their defined role and interfaces, rather than grouped under an unspecified valve casting description. The body, cover or bonnet arrangement and internal parts form a coordinated assembly. Foundry Queen helps buyers separate component manufacturing requirements from complete-valve performance approval.

Identify the exact valve arrangement
Provide the valve design reference and component drawing. Different valve constructions divide the assembly into different pieces, so a familiar part name may not identify the same item across suppliers. State whether the enquiry covers one component or a matched set.
The ball valve body casting page and valve bonnet casting page are separate product types. Their inclusion in one category does not mean they mate or form an approved valve together.
Control sealing and alignment interfaces
Mark the faces, bores, grooves and threaded features that relate to seats, seals, stem parts and adjoining components. Use the approved datum system to define their relationships. An outside profile that matches the model does not prove the internal assembly will align.
Clarify which features will be cast and which will be machined. Review stock, access and fixturing before the casting tool is approved. A difficult sealing feature discovered after tooling may require a change to the casting or manufacturing sequence.
Specify pressure-boundary requirements through the design authority
Where a component forms part of a pressure boundary, provide the applicable material and manufacturing requirements established for the valve. The responsible authority must define examinations, testing and any permitted repairs. This guide does not prescribe a rating or approval route.
A material certificate is not a complete-valve test report. Likewise, a successful component test does not automatically demonstrate sealing or operating performance of the assembled valve. Keep each required piece of evidence linked to the condition it actually verifies.
Separate supply stages in the quotation
A foundry may quote raw castings while a machining supplier quotes finished parts. Make cleaning, heat treatment, machining, finishing and documentation visible. Identify who is responsible for the final condition and for coordinating any subcontracted stages.
For a matched set, specify whether identification or pairing is required. If interchangeable production is intended, the drawing and inspection plan must establish it. Do not rely on hand-fitting a sample as proof that future components from different batches will assemble correctly.
Example: a body and cover ordered from separate sources
The body and mating cover may each meet their own incomplete drawing while failing to assemble as intended. Coordinate the shared interface, datum references and final condition before separate purchase orders are released. If interchangeability is required, specify the acceptance basis. A hand-fitted pair is not evidence that future parts from different batches will be interchangeable.
Approve samples with the full interface set
Sample review should include the critical dimensions and relevant mating checks defined by the customer. Record deviations and approved changes before repeat production. Keep the model, drawing and inspection plan synchronized.
When replacing an existing part, avoid reproducing wear or damage without review. Provide the original specification where possible, and identify any measured dimensions that are uncertain. The manufacturer should receive a controlled requirement rather than an instruction to copy a worn component exactly.
Enquiry checklist
| Valve component enquiry | Clarify |
|---|---|
| Identity | Design reference, component and matched-set scope |
| Manufacturing | Casting, stock, machining and finish |
| Acceptance | Material records, examinations and test responsibility |
Discuss the required pump and valve component scope with Foundry Queen. A component quotation should remain distinct from a claim of complete valve certification.
Technical reference
SFSA: Steel Castings Handbook, Supplement 2. This reference provides technical context; it does not establish Foundry Queen certification or project approval.



